2-HOUR FIRST RESPONSE QUOTE IN 24 HOURS NDA AVAILABLE ON REQUEST
Services

Five processes, chosen by geometry — not by habit

The cheapest process is the one that fits the part. Send the file and we will say which of these five gets you a usable part fastest, including when the answer is “print it first, machine it later”.

Service list

01

CNC Machining

When the part has to hold a dimension in the real alloy — functional prototypes, fixtures and bridge-to-production volumes.

Tolerance
DIN/ISO 2768-m, ±0.02 mm on request
Lead time
3–7 working days
Materials
8 plastics · 7 metals
Learn more
02

3D Printing

When the geometry is the question, not the material — form studies, fit checks and jigs before tooling is committed.

Tolerance
±0.1 mm typical (SLA)
Lead time
2–5 working days
Materials
SLA · SLS · FDM
Learn more
03

Vacuum Casting

When you need ten identical-looking parts for a user trial and a mould tool is still months away.

Tolerance
±0.2 mm typical
Lead time
4–7 working days
Materials
PU resin, 12 durometers
Learn more
04

Sheet Metal

When the enclosure is a folded box, not a machined block — brackets, chassis and panels from 0.8–6 mm stock.

Tolerance
±0.1 mm on cut features
Lead time
5–8 working days
Materials
Aluminium · steel · stainless
Learn more
05

Surface Finishing

When the part works but has to look like the production unit — anodising, bead blasting, powder coat and laser marking.

Tolerance
Per finish spec, colour matched
Lead time
2–4 working days added
Materials
Metal & plastic substrates
Learn more

Tolerances and lead times are typical values confirmed per part. Mixed processes — printing a prototype and machining the same design — are quoted as one order.

How the choice is made

Three questions decide the process

  1. 01 Does it have to be the production material?

    If yes, machine it. If the answer is “we just need the shape”, print it and save a week.

  2. 02 Which dimensions actually matter?

    Two critical fits and a cosmetic face are a machining job. A whole surface with no flat reference is usually a printing job.

  3. 03 How many, and how soon?

    One to 200 pcs is CNC territory. Above that, the quote will show where a cast or formed process starts to win.

Next step

Not sure which process fits? Send the drawing.

An engineer reads the geometry and the callouts, then recommends the cheapest route to a part that passes inspection — with DFM notes, within 24 hours.

Partner factory
Partner factory
Partner factory
DIN / ISO 2768-m / f · CMM reports available
WhatsApp