2-HOUR FIRST RESPONSE QUOTE IN 24 HOURS NDA AVAILABLE ON REQUEST
Quality & confidentiality

Inspection you can read, and an NDA we sign first

Two things engineers ask about before sending a file: will the part be checked, and who sees the drawing. Both answers are process, not policy language.

01 — Quality

Five checkpoints between the machine and the box

Inspection is scheduled into the lead time, not added when something looks wrong. Any order can ship with the record attached.

  1. 01

    Incoming material check

    Grade and condition verified against the mill certificate before the stock is released to a machine.

  2. 02

    In-process inspection

    First-off part measured, then hourly checks on critical features while the batch runs.

  3. 03

    Dimensional inspection (CMM)

    Critical features measured on a calibrated coordinate measuring machine at 20 °C, against the drawing datums.

  4. 04

    First article inspection (FAI)

    Every ballooned dimension on the first part of a run recorded on an FAI sheet, on request.

  5. 05

    Pre-shipment photo / video

    Parts photographed as packed, with the inspection record attached before the parcel is booked.

Documents we can ship with an order

  • Material certificate Mill certificate for the lot, on request
  • Dimensional inspection report CMM record for critical features
  • Pre-shipment photos & videos As packed, before the courier collects
  • Third-party inspection SGS or TÜV, quoted separately
Our position

If a dimension is out of tolerance, or an assembly does not fit, because of our process, the part is remade or refunded at our cost. The inspection record decides the question.

Only the data needed to make the part, only with the partner factory running your order, and only after the NDA is in place. The factory is bound by the same confidentiality terms, and the file is not passed to any other supplier for comparison quoting.
Project files are kept for the duration of the work and for the agreed warranty period, then deleted. If you want them removed earlier, send a written request and we confirm deletion by email — normally within two working days.
The inspection record decides it. If the deviation comes from our process, the part is remade or refunded at our cost. If the drawing was ambiguous, we will show where the reading was taken and agree a fix before reworking.
Yes. SGS, TÜV or your own nominated inspector can be booked against the order. We will hold shipment until the report is issued, provided the inspection is arranged before the planned ship date.
Next step

Send the drawing under NDA.

Tell us which agreement you need and it goes out before the file is opened. The DFM review and quote follow within 24 hours.

Partner factory
Partner factory
Partner factory
DIN / ISO 2768-m / f · CMM reports available
WhatsApp